Calachem Grangemouth

Working with Merit Holdings, major demolition work was carried out in order to remove the 20x10m concrete mezzanine floor, resulting in the removal of over 10 tonnes of concrete. A new drain was installed for the clean room, and new concrete floors were pumped in and laid.

Services

  • Demolition work
  • Installation of new drain
  • Installation of concrete floor